Market Sectors

Hawthorne Blvd. Median Beautification

The Hawthorne Blvd. Median Beautification project transformed existing asphalt medians into vibrant, sustainable landscapes. This initiative enhances the visual appeal of the corridor while promoting environmental stewardship through drought-tolerant design. Asphalt Removal: Cleared existing asphalt surfaces to prepare for new landscaping. Bio-Swales Installation: Integrated bio-swales for stormwater management and ecological benefits. Natural Stone Features: Placed Palos Verdes rock boulders and Black Mexican Beach Cobble for texture and visual interest. Drought-Tolerant Planting: Installed trees and shrubs designed to thrive in low-water conditions.

CYPRESS SPORTS PARK

Marina has the privilege in working with Horizons Construction in this project for this city park in Cypress, CA. Marina installed artificial turf, irrigation, and landscape.

CAYETANO PARK

Marina installed artificial turf for Cayetano Park in Livermore, CA. This park This community park is 10.5 acres, with sports fields available for rental use. Marina also added striping to the field and Musco lighting.

VIA TOLEDO PARK

This new 2-acre park includes improvements on its multipurpose lawn, half-court basketball, play area, fitness, picnic, plaza, shade structure, and irrigation. Entrance areas showcase planting designs with small flowers and grasses.

NORTHWEST LAND PARK - OLYMPIANS PARK

A 3.35-acre park with new amenities that includes a bike trail/jogging loop, amphitheater, a Riparian Garden, dog park, playground, sport courts, and picnic tables. The new Olympians Park was designed for Sacramento locals and visitors from the region.

MEADOWS PARK

After remaining undeveloped for years, Meadows Park now features a complete community garden, dog park, two half basketball courts, walkways, common green areas, and more.

PYRAMID PARK

Pyramid Park is a 2.76-acre park that features concreate pathways, a full-size basketball court, open turf-area, off-leash dog area, public art, and more. Other miscellaneous work on this project includes planting, irrigation, grading, drainage, and site furnishings.

TUSTIN LEGACY LINEAR PARK SEGMENT 3 & 4

The new Tustin Legacy Linear Park consisting of 20-25 acres includes soccer and softball fields, tennis courts, and community center. Scope of construction work consists of grading, storm drain, and landscape and irrigation.