Installation of seeding at solar arrays. Perimeter screen planting.
Installation of landscape and irrigation at the two new Metrolink stations and parking lots.
Installation of landscape and irrigation of 11 rail stations between Barrio Logan and San Ysidro
Light rail median landscaping in Milpitas, CA. Site work consists of grading, hardscape paving, irrigation system installments, and landscape plantings.
Median landscape improvements include demolition of existing landscape with new irrigation and planting. La Mirada and Rosecrans Intersection work features a five-foot wide planting area with a 30” high raised planter.
A resolution to traffic congestion, the bridge connected to I-215 is lengthened for easier access.
Landscaping work and improvements completed by Marina at Gabion Ranch in Fontana, CA along the perimeter of Sierra Ave. and Summit Ave.
Roadway improvements on Los Patrones Parkway include the alignment, design, and construction of a new Arterial Highway between Oso Parkway and Cow Camp Road.