Client: Granite Construction/Owner: Caltrans
Along a 115-mile stretch on State Route 15 from Barstow, California, to Stateline (Primm), Nevada, Marina sprayed a two-application hydroseed mix for general contractor Granite Construction. On this Caltrans project, Marina hydroseeded over 365 acres during a six-month timeframe. Granite expedited this project with Caltrans, so consequently, Marina overcame challenges of mobilizing quickly to the site as portions of work became available within small windows of time throughout the course of the job. Partnering both with Granite Construction and Caltrans, Marina was able to meet all deadlines. This was a successful project for the owner, contractor, and subcontractor, as all parties worked together to see the job through.
Redlands
Twentynine Palms
Anaheim, CA
City of Yorba Linda
Client/Owner: City of La Quinta
Pico Rivera, CA
San Diego, CA
Placentia, CA
Wilmington, CA
Anaheim, CA
Lake Forest, CA
Laguna Hills, CA
Dana Point, CA
San Marcos, CA