Market Sectors

PERRIS VALLEY HIGH SPEED TRANSIT

Installation of landscape and irrigation at the two new Metrolink stations and parking lots.

BLUE LINE TROLLEY STATION

Installation of landscape and irrigation of 11 rail stations between Barrio Logan and San Ysidro

LIGHT RAIL MEDIAN LANDSCAPING PH II

Light rail median landscaping in Milpitas, CA. Site work consists of grading, hardscape paving, irrigation system installments, and landscape plantings.

CAPITAL IMPROVEMENTS - MEDIAN LANDSCAPE IMP

Median landscape improvements include demolition of existing landscape with new irrigation and planting. La Mirada and Rosecrans Intersection work features a five-foot wide planting area with a 30” high raised planter.

I-215 INTERCHANGE - BARTON ROAD INTERCHANGE

A resolution to traffic congestion, the bridge connected to I-215 is lengthened for easier access.

GABION RANCH - SIERRA AVE AND SUMMIT AVE PERIMETER LANDSCAPE IMP

Landscaping work and improvements completed by Marina at Gabion Ranch in Fontana, CA along the perimeter of Sierra Ave. and Summit Ave.

LOS PATRONES PARKWAY ROADWAY IMPROVEMENTS

Roadway improvements on Los Patrones Parkway include the alignment, design, and construction of a new Arterial Highway between Oso Parkway and Cow Camp Road.

REGIONAL CONNECTOR TRANSIT CORRIDOR

Installation of native plants, irrigation, trees in tree wells, and 3-year maintenance connecting 3 underground Metro stations across Downtown Los Angeles.