EFFLUENT EQUALIZATION FACILITY STABILIZATION

Project consists of removing and replacing existing site features to repair and stabilize soil on the north side of the facility. Additional work includes soil remediation, reconstruction and improvement of embankment slope, and planting after reconstruction.

Project consists of removing and replacing existing site features to repair and stabilize soil on the north side of the facility. Additional work includes soil remediation, reconstruction and improvement of embankment slope, and planting after reconstruction.

RELATED INSIGHTS

NORTH PLEASANT VALLEY GROUNDWATER DESALTER

The new desalter plant in Camarillo, CA doubles water production using local groundwater sources. Water filtration used includes greensand filtration and reverse osmosis to produce quality drinking water.

JONES RESERVOIR IRRIGATION

Jones Reservoir holds about 50 million gallons of blended water and is disinfected for distribution. Work for this project includes irrigation completed by Marina.

AGUA HEDIONDA SEWER LIFT STATION

Project improvements include the installation of a two-mile sewer pipeline carrying water from the north shore of Agua Hedionda Lagoon to the Encina Water Pollution Control Facility in Carlsbad, CA. Other work includes construction of a prefabricated steel truss bridge, wastewater lift stations, and a sewer force main pipeline.

FALLBROOK BATTERY STORAGE

Fallbrook battery storage facility in Fallbrook, CA, with site work consisting of landscaping and grading.

LAKE HERMAN SOLAR

This project is about 35-acres on a 88.5-acre parcel in Benicia, CA. On site work includes the installation of solar panels on the north side of Lake Herman Rd.

GRAND SOLAR

Installation of seeding at solar arrays. Perimeter screen planting.