Crenshaw - LAX Transit Corridor

Marina has the privilege in working with Walsh/Shea Corridor in providing irrigation and landscaping services for various stations and segments in the new K Line transit route.

Marina has the privilege in working with Walsh/Shea Corridor in providing irrigation and landscaping services for various stations and segments in the new K Line transit route.

RELATED INSIGHTS

PERRIS VALLEY HIGH SPEED TRANSIT

Installation of landscape and irrigation at the two new Metrolink stations and parking lots.

BLUE LINE TROLLEY STATION

Installation of landscape and irrigation of 11 rail stations between Barrio Logan and San Ysidro

LA Metro Purple Line #3

The Purple Line Extension Section 3 project is a design‑build effort led by Tutor Perini and partners to construct 2.56 miles of twin‑bore tunnels and new Westwood-area stations, with civil, architectural, structural, mechanical, electrical, plumbing, and landscape design provided as part of the integrated station design package.

REGIONAL CONNECTOR TRANSIT CORRIDOR

Installation of native plants, irrigation, trees in tree wells, and 3-year maintenance connecting 3 underground Metro stations across Downtown Los Angeles.

Metro Light Rail Phase II

This design-build project includes the Phase II alignment of the Expo Light Rail Line from Culver City to Santa Monica. The 6.6-mile extension will link downtown Los Angeles to the 4th Street and Colorado Terminus Station. This urban project requires miles of street alignment through both the cities of Los Angeles and Santa Monica. Marina's challenges in designing the landscape construction package include creating landscape continuity along the miles of rail line, creating a sense of place within each community and at each of the seven stations, and adhering to multiple municipal and MTA requirements during the design and construction phases.

NCTD Sprinter Mainline

Marina has the privledge in joining West Coast Construction in developing the NCTD Sprinter Mainline in Oceanside, CA. This project consists of irrigation and landscape (mainly hydroseed) for the mainline track, bike trail, and the 14 stations along the sprinter rail line in northern San Diego connecting Oceanside to Escondido.

Exposition Light Rail Transit Phase 2 Design/Build Project

Marina collaborated with Skanska together with 29 other small businesses in completing this 6.6-mile Exposition Light Rail Transit Phase 2 project extends the Expo light rail line from Culver City to Santa Monica, just four blocks from the Pacific Ocean. The scope of work included 14 miles of track as well as five at-grade stations and two aerial stations. Additionally, the project included one mile of elevated transitway and added a new bicycle path adjacent to the rail line.